National Water and Sewerage Cooperation (NWSC) has commissioned Kazo-Buremba Water Supply Project Phase 1 in Rushere Area.
This has been done in a bid to improve access to safe clean water in the Cattle Corridor.
Project Scope
1.The project entailed Trenching, laying of a transmission line from the borehole to the Tanks
40m3 existing , Distribution Mains to target customers.
2.Pump lowering, Casting, Panel installation, Generator Installation and Pump testing with the total Yield of 9.5M3/hr.
3.Tank Bases construction 0.5m above the ground, setting and Curing for 20M3 twin Plastic Tanks. This will be followed by elevating two Tanks 6M above the ground to catter for customers at the hilltops and increments in demand.
- Successfully tested and filled the tank Uphill at satisfactory pressures to the delight of the customers.